Planned maintenance
A system upgrade is planned for 17/11-2026, at 12:00-13:00. During this time DiVA will be unavailable.
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Utilisation of measurement while drilling to optimise blasting in large open pit mining
2001 (English)Licentiate thesis, monograph (Other academic)
Abstract [en]

The subject of this thesis is the utilisation of measurement while drilling to optimise blasting in large open pit mines. In Boliden´s open pit mine, Aitik drilling and blasting is a substantial part of the cost. An optimisation of drilling and blasting can therefor give large annual savings. A method to reduce costs is to influence drilling and blasting according to the properties of the rock. Today the problem is the lack of a detailed information of the rock that is required for an optimisation. The aim of the work in registering and analysing drill parameters is to establish a model to design blasting in a more efficient manner, that is to produce an optimal blasting regarding loading times and crushing. The first step will focus on finding relationships between the drilling parameters and the geological parameters that affect blasting. These relationships are called interpretation models. In the thesis a new interpretation model is presented, tested in the field and discussed.

Place, publisher, year, edition, pages
Luleå: Luleå tekniska universitet, 2001. , p. 73
Series
Licentiate thesis / Luleå University of Technology, ISSN 1402-1757 ; 2001:10
National Category
Other Civil Engineering
Research subject
Mining and Rock Engineering
Identifiers
URN: urn:nbn:se:ltu:diva-18634Local ID: 9868fb40-d321-11db-b6e3-000ea68e967bOAI: oai:DiVA.org:ltu-18634DiVA, id: diva2:991643
Note

Godkänd; 2001; 20070315 (ysko)

Available from: 2016-09-29 Created: 2016-09-29 Last updated: 2025-10-21Bibliographically approved

Open Access in DiVA

No full text in DiVA

Other Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 451 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf