Planned maintenance
A system upgrade is planned for 17/11-2026, at 12:00-13:00. During this time DiVA will be unavailable.
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Managing the wheel-rail interface: Railway infrastructure maintenance in a severe environment: The Swedish experience
2009 (English)In: Wheel—rail interface handbook, Woodhead Publishing Materials , 2009, p. 633-652Chapter in book (Refereed)
Abstract [en]

This chapter comprises a short introduction to and overview of the challenges that face engineers and researchers working in the field of heavy haul railway operations in a cold climate. If these problems are to be overcome, experts from different engineering disciplines need to work together in order to find solutions for the next generation of heavy haul operation, which will see heavier, longer and faster trains with new train control systems and operating philosophies. Malmbanan runs from the port in Narvik, across the Swedish/Norwegian border via the mines in Kiruna and Malmberget, to the port in Luleå on the coast of the Gulf of Bothnia. The 100 year old ore line runs through rough terrain including high mountains, peat, terraces situated on the fjords in Norway and numerous short bridges and culverts, and part runs above the Arctic Circle. Over the course of its life, the line and its ore traffic have been continuously upgraded. Today 750 m long trains with 30 tonne axle loads are in operation. If cost-efficient operation is to be maintained, engineers must continue to seek new and effective maintenance and operating systems for both infrastructure and rolling stock.

Place, publisher, year, edition, pages
Woodhead Publishing Materials , 2009. p. 633-652
National Category
Other Civil Engineering
Identifiers
URN: urn:nbn:se:ltu:diva-20520DOI: 10.1533/9781845696788.2.634ISI: 000276201100023Scopus ID: 2-s2.0-84941267203Local ID: 59d600b3-b67e-48ca-9fcb-0e207dd18d06ISBN: 978-1-84569-412-8 (print)ISBN: 978-1-84569-678-8 (electronic)OAI: oai:DiVA.org:ltu-20520DiVA, id: diva2:993564
Note

Upprättat; 2009; 20131009 (ysko)

Available from: 2016-09-29 Created: 2016-09-29 Last updated: 2025-10-21Bibliographically approved

Open Access in DiVA

No full text in DiVA

Other links

Publisher's full textScopus

Authority records

Larsson-Kråik, Per-Olof

Search in DiVA

By author/editor
Larsson-Kråik, Per-Olof
Other Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar

doi
isbn
urn-nbn

Altmetric score

doi
isbn
urn-nbn
Total: 145 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf